Logo

  • Home
  • Projects
  • Studio
  • Contact
  • Home >
  • Projects >
  • Performing Arts >
  • Geoffrey Alan Laverty Center
Title

Title

  • Title Title Title
  • Title Title Title
  • Title Title Title
  • Title Title Title
  • Title Title Title
  • Title Title Title
  • Title Title Title
  • Title Title Title
  • Title Title Title
  •  
View the embedded image gallery online at:
https://parallaxassociates.com/index.php/projects/item/62-chadwick-laverty-center#sigProGalleria2673a959c9

Geoffrey Alan Laverty Center

  • Chadwick School

Palos Verdes, CA
Performing arts have been an integral part of Chadwick School’s curriculum since its founding in 1935. However, by 2000, a new facility was required to accommodate the school’s expanding music and theater arts programs. To meet this challenge, Parallax designed a highly flexible building that allows many types of events to occur simultaneously. The new Laverty Center provides a 400-seat auditorium, an intimate black box theater, studios for music and dance instruction, and a generous lobby space that extends out to landscaped terraces.

parallax-architecture-and-planning

5765 Uplander Way     Culver City, CA 90230     310.216.5775     This email address is being protected from spambots. You need JavaScript enabled to view it.